Delivery Arrives Before the Site Is Ready
A delivery vehicle arrived carrying materials that needed to be unloaded by crane. The problem was simple: The site wasn’t ready for the delivery. The planned unloading area was occupied by stored materials, a concrete wagon was expected shortly, and another subcontractor had partially blocked the access route. With the lorry already waiting, pressure developed to “just get it unloaded somewhere.” The lifting operation was now being dictated by logistics rather than the lift plan. What Went Wrong - Delivery timing was not coordinated with site activities. - The designated unloading/laydown area was unavailable. - Access routes were obstructed. - Materials already stored on site reduced available space. - Pressure to avoid delaying the delivery encouraged an alternative landing position. - Crane operations, deliveries and other moving plant were competing for the same area. The Logistics Problem Good lifting operations depend on good logistics. Before the vehicle arrives, the site should know: Where does it enter? Where does it wait? Where will it be unloaded? Where will the materials be stored? How will the vehicle leave? If those questions are answered only when the lorry reaches the gate, the operation is already becoming reactive. Key Lessons Learned The crane should not become the solution to poor logistics planning. Moving a load to an unplanned location can introduce new: - Ground-condition issues. - Crane-radius problems. - Pedestrian interfaces. - Vehicle conflicts. - Exclusion-zone problems. - Double handling later in the shift. Sometimes delaying the delivery is safer than creating an improvised lifting operation. Safety Recommendations - Use delivery booking/time slots. - Establish designated unloading and laydown areas. - Keep crane access and lifting zones clear. - Coordinate concrete wagons, pumps and major deliveries. - Confirm the unloading area before the vehicle enters site. - Prevent uncontrolled material storage in logistics routes. - Brief changes between logistics and lifting teams. - If the planned landing area is unavailable, stop and reassess before changing the lift.
0
0
Delivery Arrives Before the Site Is Ready
Staying Behind or Under a Crane: The Blind-Zone
On a busy construction site, slingers and other site personnel were observed using the area behind and underneath a crane as a temporary place to stand, wait or shelter. To them, it appeared to be out of the way. In reality, they had positioned themselves inside one of the most dangerous areas around operating plant. A crane can slew, travel, reposition or move unexpectedly as operations change. The operator may have significant blind spots and may have no idea that someone has walked behind, underneath or alongside the machine. One unexpected movement could leave that person with nowhere to escape. What Went Wrong Personnel entered the crane’s operating area unnecessarily. Workers positioned themselves within operator blind spots. The crane was treated as somewhere to shelter or wait. Personnel relied on the operator knowing where they were. Potential slew, counterweight and tracking/reversing zones were not respected. Safe pedestrian areas were not being used. Key Lessons Learned If you cannot see the operator, never assume the operator can see you. The danger is not limited to the suspended load. Depending on the crane type, hazards can include: - Slewing counterweights. - Tracks and wheels. - Reversing movements. - Outriggers and stabilisers. - Crushing points between the crane and structures. - Suspended loads and lifting accessories. - Unexpected crane repositioning. A crawler or mobile crane may also start travelling after sitting stationary for a period. Stationary does not mean safe. The Slinger Has an Extra Responsibility A Slinger/Signaller should understand plant movement and exclusion zones. They should therefore be setting the example — not hiding behind the crane between lifts. If the slinger needs to take a break, wait for another lift or shelter from weather, a designated safe area should be used. The crane’s footprint is not a welfare area. Safety Recommendations Establish clear crane and plant exclusion zones. Identify counterweight and slew-radius hazards.
1
0
Staying Behind or Under a Crane: The Blind-Zone
Unsecured Tower Crane Base
In a busy construction site, a tower crane base was found with no dedicated entrance gate, no secure locking arrangement, and no crane identification or information board displayed. The crane tower was freely accessible from the site, allowing unauthorised persons to approach or potentially climb the tower. Although there is no specific legal requirement stating that every tower crane must have an information board at its base, it is widely regarded as good industry practice to provide clear crane identification, emergency contact details, crane information, and secure access control. Without these measures, the risk of unauthorised access, vandalism, misuse, or climbing the crane increases significantly. What Went Wrong No dedicated crane entrance provided. Tower crane base left accessible to unauthorised personnel. No lockable access gate fitted. No crane identification or information board displayed. Poor control of access around lifting equipment. Failure to follow recognised industry good practice. Key Lessons Learned Tower cranes should be treated as restricted work equipment. Unauthorised climbing places individuals at significant risk. Physical security is part of crane safety management. Information boards assist emergency services and site personnel. Good practice often exceeds the minimum legal requirement. Safety Recommendations Provide a dedicated, lockable entrance to every tower crane. Restrict access to authorised personnel only. Display a crane information board showing crane identification, emergency contacts, crane type and safe working information where appropriate. Inspect crane base security during routine site inspections. Challenge poor access control before lifting operations begin. Incident Source Real site observation – UK construction site (2026). Multiple tower cranes observed without secure access control or crane identification boards despite being located within active construction sites. Regulatory Mapping ● PUWER Reg. 23 – Measures must prevent unauthorised use of work equipment.
2
0
Unsecured Tower Crane Base
Unstable Scaffold Trailer During Loading
A scaffold lorry was being loaded by a crane team on a construction site. Loads were landed unevenly across the trailer bed, concentrating excessive weight toward the front. As loading continued, the rear of the trailer lifted off the ground, clearly indicating instability. Despite this, heavy scaffold equipment continued to be landed in front of the trailer. What Went Wrong The loading sequence was not planned and axle loads were not considered. The trailer was not stabilised and the operation continued despite visible instability. Key Lessons Learned - Vehicle loading is part of lifting operations - Uneven loading can destabilise trailers - Visible instability is a stop-work trigger Safety Recommendations Vehicle loading must be planned and sequenced. Lifting operations must stop immediately if instability is observed. Mapping Regulations ●LOLER 1998 – Regulation 4 (Strength and stability); Regulation 8 (Organisation of lifting operations) ●PUWER 1998 – Regulation 4 (Suitability of work equipment) ●BS 7121-1 – Planning and control of lifting operations, including loading/unloading vehicles ●BS 7121-2 – Mobile crane operations and load sequencing ●CDM 2015 – Management of interface risks and safe logistics planning Wolf Lifting Dynamics Limited – Safe Lifting UK | www.wolflifting.uk | Case Study 41
0
0
Unstable Scaffold Trailer During Loading
Crane Failure Exposing the Public to Risk
Five tower cranes operating simultaneously next to live public roads, lifting materials within a constrained site boundary. During slewing, the tower crane (TC1) hook-block extended beyond the designated site perimeter and over a public bus stop shelter. At the same time, a control fault occurred inside the crane cabin, where the joystick became stuck and the zoom/limitation system failed to respond as expected. The crane movement could not be immediately controlled, placing pedestrians and members of the public at risk outside the site boundary. What Went Wrong The lifting operation was carried out too close to a live public interface without adequate physical protection or secondary controls. Mechanical failure within the crane controls escalated the risk rapidly, and the exclusion zone did not extend far enough to protect third parties. Key Lessons Learned Public protection must extend beyond site boundaries Crane failures can happen suddenly and without warning Live roads and bus stops require enhanced planning and safeguards Mapping Regulations ●LOLER 1998 – Regulation 4 (Strength and stability); Regulation 8 (Organisation of lifting operations, including protection of persons) ●PUWER 1998 – Regulation 4 (Suitability of work equipment); Regulation 5 (Maintenance) ●BS 7121-1 – Planning and control of lifting operations; protection of third parties and public interfaces ●BS 7121-2 / BS 7121-3 – Crane operational controls and safety systems (tower cranes) ●CDM 2015 – Management of risks to non-workers and the public Wolf Lifting Dynamics Limited – Safe Lifting UK | www.wolflifting.uk | Case Study 36
0
0
Crane Failure Exposing the Public to Risk
1-7 of 7
powered by
Safe Lifting
skool.com/wolf-lifting-dynamics-9548
This community shares real lifting case studies, consultancy insights, and site-proven lessons covering cranes, supervision, planning, and execution.
Build your own community
Bring people together around your passion and get paid.
Powered by