Unsecured Tower Crane Base
In a busy construction site, a tower crane base was found with no dedicated entrance gate, no secure locking arrangement, and no crane identification or information board displayed.
The crane tower was freely accessible from the site, allowing unauthorised persons to approach or potentially climb the tower.
Although there is no specific legal requirement stating that every tower crane must have an information board at its base, it is widely regarded as good industry practice to provide clear crane identification, emergency contact details, crane information, and secure access control.
Without these measures, the risk of unauthorised access, vandalism, misuse, or climbing the crane increases significantly.
What Went Wrong
No dedicated crane entrance provided.
Tower crane base left accessible to unauthorised personnel.
No lockable access gate fitted.
No crane identification or information board displayed.
Poor control of access around lifting equipment.
Failure to follow recognised industry good practice.
Key Lessons Learned
Tower cranes should be treated as restricted work equipment.
Unauthorised climbing places individuals at significant risk.
Physical security is part of crane safety management.
Information boards assist emergency services and site personnel.
Good practice often exceeds the minimum legal requirement.
Safety Recommendations
Provide a dedicated, lockable entrance to every tower crane.
Restrict access to authorised personnel only.
Display a crane information board showing crane identification, emergency contacts, crane type and safe working information where appropriate.
Inspect crane base security during routine site inspections.
Challenge poor access control before lifting operations begin.
Incident Source
Real site observation – UK construction site (2026).
Multiple tower cranes observed without secure access control or crane identification boards despite being located within active construction sites.
Regulatory Mapping
● PUWER Reg. 23 – Measures must prevent unauthorised use of work equipment.
● LOLER Reg. 8 – Lifting equipment must be operated under safe management arrangements.
● CDM 2015 – The Principal Contractor must prevent unauthorised access to construction work.
● BS 7121-1 – Access to cranes should be controlled and restricted to authorised personnel.
Key Point
A tower crane should never have an open invitation to climb.
Good security is good lifting practice.
Wolf Lifting Dynamics | www.wolflifting.uk | Case Study 113
2
0 comments
Vlad Lupu
4
Unsecured Tower Crane Base
powered by
Safe Lifting
skool.com/wolf-lifting-dynamics-9548
This community shares real lifting case studies, consultancy insights, and site-proven lessons covering cranes, supervision, planning, and execution.