A scaffold lorry was being loaded by a crane team on a construction site. Loads were landed
unevenly across the trailer bed, concentrating excessive weight toward the front. As loading
continued, the rear of the trailer lifted off the ground, clearly indicating instability. Despite this,
heavy scaffold equipment continued to be landed in front of the trailer.
What Went Wrong
The loading sequence was not planned and axle loads were not considered. The trailer was not
stabilised and the operation continued despite visible instability.
Key Lessons Learned
- Vehicle loading is part of lifting operations
- Uneven loading can destabilise trailers
- Visible instability is a stop-work trigger
Safety Recommendations
Vehicle loading must be planned and sequenced. Lifting operations must stop immediately if
instability is observed.
Mapping Regulations
●LOLER 1998 – Regulation 4 (Strength and stability); Regulation 8 (Organisation of lifting operations)
●PUWER 1998 – Regulation 4 (Suitability of work equipment)
●BS 7121-1 – Planning and control of lifting operations, including loading/unloading vehicles
●BS 7121-2 – Mobile crane operations and load sequencing
●CDM 2015 – Management of interface risks and safe logistics planning