Structural steel went in today for the gable end entryway. Im there tomorrow starting to help set the runs of pipe, main channel drain and conduits with my electrician and plumber in preparation for the floor being poured next week. Sewer, water, gas and electric pipes going into the house are all inspected and backfilled. Next up are the structural masons that will build out the two gables.