June 16 check in
Structural steel went in today for the gable end entryway. Im there tomorrow starting to help set the runs of pipe, main channel drain and conduits with my electrician and plumber in preparation for the floor being poured next week. Sewer, water, gas and electric pipes going into the house are all inspected and backfilled. Next up are the structural masons that will build out the two gables.
I’m going to start posting again on socials regularly, as honestly I’ve got a lot of cool shit going on and I do need to share it with the world. For any of you interested:
Instagram:
@TheLotusGardener
@artfully_stoned
Facebook:
@TheLotusGardener
@RockArtStudios
4
3 comments
Jay Bearfield
5
June 16 check in
Wolf Tribe
skool.com/wolftribe
Learn How We Transform Disconnected Teams into Thriving, High-Performing Tribes Using Our Proven, Battle-Tested Leadership Framework.
Leaderboard (30-day)
Powered by