And to think that I started this mess 12 days ago on 9.2.
It has been a very busy weekend. Moved bookshelves, corner unit and three CD shelves to the vocal area. This entailed removing all of the books (a couple hundred), CDs, and whatnot including awards from way back when, removing shelves from the carcases, move every down stairs, position, reload, relax. The good Part aside from getting it all moved is that the vocal area feels quieter. Plus I found a ton of books I no longer need. Looks like I’ll be busy listing on ebay and Marketplace during my spare time.
Once the shelves were complete, it was time to take the slanted 30 space two bay oak rack down. Fortunately it’s empty, so it weighed much less. The challenge here was clearing out temp space for where it was going along with the path to get it there.
The biggest challenge even though it was easy was to take the upstairs door off its hinges and go down. I suspected that I might have needed to remove one or both vertical jam pieces in the doorway. FortunArely that wasn’t the case.
The next challenge was getting help to take her down. Enter my youngest step son Matthew. With his help, moving this piece was a breeze. Then again, he’s a beast. He got a full ride playing defensive end for D1 school. He graduated a couple of years ago but still works out for body maintenance. That was the weekend. Now to start populating the racks with gear.
Once all is racked, it will be time to wrestle the snake (wiring harness). Even though all of the conductors and plugs are numbered and I have a master location list, It’s going to take some time. I’m hoping to get that done and test everything by Thursday or Friday.
If all works as hoped for, I should be operational this coming weekend. Woo Hoo!