Property management inspection processing. 180 reports annually. Manual review consuming 360 hours.
Built n8n automated workflow. Zero manual analysis. Systematic issue prioritization.
THE PROPERTY MANAGEMENT PROBLEM:
Every inspection report requiring manual processing. Property manager reading entire 20-40 page document. Manually highlighting issues across locations. Typing details into spreadsheet. Attempting severity categorization. Calculating repair costs manually.
Creating ownership summary subjectively. 2 hours per report. 180 reports annually = 360 hours consumed.
Quality audit revealed 23 critical safety hazards not flagged for immediate action. 45 major system failures categorized incorrectly. Inconsistent risk assessment across properties.
THE n8n AUTOMATION:
8-node workflow with 2-path risk-based notification routing:
Node 1 - Google Drive Trigger: Monitors inspection report folder
Node 2 - Download Report: Retrieves inspection document
Node 3 - Prepare Binary: Formats for document processing
Node 4 - Extract Inspection Data: Pulls issues, costs, systems status
Node 5 - Analyze & Prioritize: Calculates priority scores, determines risk level
Node 6 - Log to Register: Updates centralized tracking database
Node 7 - Generate Summary: Creates HTML report, uploads to Drive
Node 8-9 - Risk-Based Routing: Critical alert OR normal notification
EXTRACTION DETAILS:
Property information - address, type, age, overall condition
Inspection metadata - date, inspector name, company
Issue details - location, category, description, severity, estimated cost, urgency, safety hazard flag
Major systems status - roof, HVAC, plumbing, electrical, foundation
Total estimated repairs - aggregate cost calculation
PRIORITY SCORING LOGIC:
```javascript
// Base severity scores
const severityScores = {
'Critical': 100,
'High': 75,
'Medium': 50,
'Low': 25
};
let priorityScore = severityScores[severity] || 50;
if (safetyHazard) priorityScore += 25;
if (urgency === 'Immediate') priorityScore += 15;
```
Issues sorted by priority score descending. Top 3 flagged for immediate attention.
RISK LEVEL DETERMINATION:
Critical issues OR safety hazards = Critical risk
3+ high issues OR $10,000+ repairs = High risk
1-2 high issues OR 5+ medium issues = Medium risk
Otherwise = Low risk
12-MONTH RESULTS:
180 reports processed automatically. Zero manual review hours. Zero subjective prioritization inconsistencies.
Critical issue identification - 100% of safety hazards flagged appropriately. 100% of major system failures rated correctly. Zero critical issues missed.
Cost accuracy - perfect totals from inspector estimates. Zero manual calculation errors.
Property manager time recovered - 360 hours annually. Reallocated to property operations.
How many hours annually reviewing inspection reports manually? What's your critical issue miss rate?