Met with a contractor today that does fire mitigation by hand (no machine). He wants to collaborate with us since he does not want to buy equipment. Trying to figure out a fair way to work together? He is also a general contractor. I was thinking of billing him with a 10% discount if he brings us in on a job. Does that seam reasonable?