User
Write something
Bathroom partition
Hi Everyone we start a new project tomorrow. Please follow our progression. πŸ™
4
0
Translation offer
We’re looking for a skilled translator fluent in English to your local languages for ongoing translating projects. If interested hit me up+1(458)343-6251
0
0
Introduction
Hello everyone, my name is Daniel and I am new here, I'm to meet more people with similar interests, I hope I'm welcomed here
1
0
Dranage replacement
Hi everyone. We documented a few step how to replace dranage easily even around high traffic areas.( project completed 15hrs period) 2 tradesmen. The dranage channel classification is D400 . Mean should handle 40 T weight. Concrete complete strength is 28 days. 75% strength after 7days ramp can be moved.
Dranage replacement
EMERGENCY SLAB REPLACEMENT
We had call out for replace an old broken concrete slab was causing trip hazard and.safety issues. We installed 12mm bars with anchor βš“οΈ rods . C50 type concrete been used with fibre additional and fastener. The time frame for work was so tight as high traffic are ( bus wash ) It been all completed within 5 hours. All been covered up with road plates and redy for traffic Plates will be removed after 7 days
EMERGENCY SLAB REPLACEMENT
1-15 of 15
UK BUILDING CONTRACTORS
skool.com/ukbuilding-contractors-5335
Building Contractors &DIY Design
Leaderboard (30-day)
Powered by