Any tips on fence line quotes, for a church, about an acre. They want limbs done too and lots of rocks lol. I was thinking polesaw for a day and stack it for the mulcher to show up and take down the pile and have got the rocks outta the way from the polesawing and stacking. Thoughts? I kinda am at 4000 for 2 days mulching 1 day polesawing. Im still renting so my biggest expense is the mulcher for 1000 a day.