Hey everyone — the Top-Down Viewer is live. 🚀 Quick math on why this one matters for your throughput. An 8-scene tour linked the old way is about 7 connections. Every connection is two hotspots, one each way. That's ~14 placements you aim by hand before you've done anything creative. With the Top-Down Viewer it's 8 drags. One per scene. How it works: ▪ Drag each scene from the strip onto the floor plane ▪ Turn it until its floor lines up with its neighbours ▪ Tiles that touch are connected — that's it ▪ Pull two tiles apart and the connection goes ▪ Click a line to delete that connection both ways at once Why it changes what you can quote: The hotspot pass is the part of a tour that never scales — it grows with every scene you add. A 30-scene commercial job is 29 connections and ~58 placements. Take that out and the big jobs stop being the ones you hesitate to bid. How to open it: 1️⃣ Open a tour 2️⃣ Click Connect Scenes in the left sidebar 3️⃣ Drag your scenes onto the plane Full walkthrough — 7 minutes, real tour, start to finish: https://youtu.be/qyETT0qHd0o How long does the hotspot pass actually take you on a 20+ scene job? Drop it below — I want to see the real numbers.