Activity
Mon
Wed
Fri
Sun
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
What is this?
Less
More

Memberships

Poison Ink Community

10 members • Free

Personalized Poetry

93 members • Free

Writing to heal

85 members • Free

Alive Poets Society✍🔥

1.7k members • Free

AI Ecommerce Systems

597 members • Free

AI Automation (A-Z)

151.5k members • Free

Dev Builders

233 members • Free

AI Essentials

4.2k members • Free

Learn Automation and AI

920 members • Free

2 contributions to Built into Mason
PluggedIn
What’s up everyone — appreciate being here 🤝 I’m John, working on a platform called PluggedIn — built around solving supply chain headaches for contractors and trades. Right now I’m tapping in to understand real problems from the field. Not theory — the stuff that actually slows you down, costs you money, or makes jobs harder than they should be. For the masons in here — I’d love to hear: • What materials are hardest to keep stocked or sourced on time? • Where are suppliers dropping the ball (pricing, delays, communication, quality)? • What’s the most frustrating part of dealing with supply on your jobs? I’m building this with the goal of making supply faster, more reliable, and actually built for how you work — not against it. If you’ve got opinions, frustrations, or even “this will never work” takes — I want to hear it. Respect to everyone putting in real work out there 🧱💪
0 likes • 6d
@Marco Caza This is a gold response from him — he just handed you real pain points AND validated your mission. You don’t want to sound salesy… you want to sound like someone who gets it and is already thinking about solutions. Here’s a response that hits different — grounded, real, and builds connection: Writing Marco — this right here is exactly the kind of insight I’m trying to build around. I appreciate you taking the time to break it down like that 🤝 That consistency issue you’re talking about… that’s the real problem. Not just getting materials — but actually being able to trust they’ll be there when you plan a job around them. What you said about: – “in stock” not being real – price changes last minute – having to chase suppliers – crews sitting because material didn’t show That’s money bleeding out, and nobody on the supply side really feels that like you guys do. I’ve been building PluggedIn with one core idea: 👉 make supply predictable, not stressful Not just finding materials — but: • real availability (not guesses) • locked-in pricing when possible • clear timelines you can actually plan around • and communication that doesn’t leave you chasing The specialty brick / matching older brick issue you mentioned is big too — that’s something I’m digging into heavy because I keep hearing it. I’m not here to sell you anything — I’m trying to build something that actually works for guys in the field. If you’re open to it, I’d love to pick your brain a little more on how you currently handle those situations when suppliers fall through. That’s where the real solutions get built. Respect back to you — this kind of feedback is what’s shaping this whole thing 💯 If you want, I can also: �⁠Turn this into a DM that converts him into a direct contact Or �⁠map this comment into a feature inside PluggedIn (like a “material reliability score” system) This is how you build something real — you’re doing it right.
🧱 WHAT DO YOU WANT TO LEARN MOST?
I want to build content that actually helps you — not just random stuff. 👉 What are you MOST interested in learning about masonry right now? Drop it below ⬇️ Examples:• How to lay bricks straight & level• Mortar types (Type S, N, M — what to use and when)• Fixing cracks / repairs• Tools & setup• Step-by-step beginner projects• Common mistakes to avoid• Pricing jobs / working in the trade 💬 Don’t overthink it — even if it’s basic, ask it. If you’re wondering about it… someone else is too.
0 likes • 9d
What’s up everyone — appreciate being here 🤝 I’m John, working on a platform called PluggedIn — built around solving supply chain headaches for contractors and trades. Right now I’m tapping in to understand real problems from the field. Not theory — the stuff that actually slows you down, costs you money, or makes jobs harder than they should be. For the masons in here — I’d love to hear: • What materials are hardest to keep stocked or sourced on time? • Where are suppliers dropping the ball (pricing, delays, communication, quality)? • What’s the most frustrating part of dealing with supply on your jobs? I’m building this with the goal of making supply faster, more reliable, and actually built for how you work — not against it. If you’ve got opinions, frustrations, or even “this will never work” takes — I want to hear it. Respect to everyone putting in real work out there 🧱💪
1-2 of 2
John Pohlman
1
4points to level up
@john-pohlman-6142
“Let’s build smarter.”

Active 5h ago
Joined Mar 31, 2026
United States