Activity
Mon
Wed
Fri
Sun
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
What is this?
Less
More
1 contribution to PMKinetic CPMAI Academy
"MVP" gets used a lot in AI projects, but most people get it wrong.
1. MVP means Minimum Viable Product. It is not a quick prototype you throw away later. 2. In CPMAI terms, an MVP is the smallest version of an AI solution that still delivers real business value and can be tested with real data. 3. An MVP is not the same as a proof of concept. A PoC checks if something is technically possible. An MVP checks if it is usable and valuable for the business. 4. A real AI MVP still moves through the six CPMAI phases, just at a smaller scale. You do not skip the data work in Phase II or Phase III just because the scope is small. 5. "Minimum" means focused scope. It does not mean low quality data, no testing, or a rushed Phase V. If your MVP cannot be properly evaluated the way a full system would, it is not an MVP. It is just a demo. How does your organisation define MVP for AI work right now? Does it match this?
0 likes • Aug 9
MVP consider as Pilot for the AI project, please correct me if I am wrong.
1-1 of 1
Diaeldien Musa
1
5 points to level up
@diaeldien-musa-7304
Dodi

Active 99d ago
Joined Aug 9, 2026