Intro - St. Louis, MO
Hi everyone - Andrew White here. I work with my family's third-generation commercial real estate company, White Company. We're based in St. Louis, MO and also own properties in FL and TX. My primary focus is acquisitions and development. I also have a legal background and help with the legal component of our business. Right now we're spending a lot of time on small bay industrial and contractor garage projects. We're actively evaluating both ground-up developments and value-add conversion opportunities where existing warehouse or flex buildings can be subdivided into smaller bays. We currently have two flex developments in the works and are looking for additional land and existing industrial properties that fit the model. I'm interested in connecting with others who are developing, acquiring, operating, or financing small bay industrial assets. Always happy to compare notes on rents, construction costs, site selection, tenant demand, and deal structure. Looking forward to learning from the group and contributing where I can.
1 like • 22d
@Matt Fonk We are in St. Lucie West
Septic with Flex?
I've heard mixed opinions on this, but have other developers had success building flex on septic systems? My concern is that it would limit users. However, many of the sites with sewer in my market (Raleigh) have too high of a land basis to pencil. Would love to hear any real-world input. Thanks!
2 likes • 29d
We are building 30,000 square feet of the basic contractor garage model (no office or heat/AC). We are doing a community bathroom that is serviced by septic. The public sewer connection point to our project was over 300 feet away. In St. Louis if you are over 200 ft away from the closest public connection point, septic is allowed otherwise they require you to connect to public sewer. If we would have had to connect to the public sewer it was going to be well over six figures of extra costs and really hurt the returns of the project. It's really only viable for our project because of the basic build we are doing and how minimally the bathroom is going to be used (projecting less than a standard household per day).