Activity
Mon
Wed
Fri
Sun
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
What is this?
Less
More
20 contributions to Full Circle Property Academy
Good first live session tonight 🙌
Thanks to everyone who jumped on it was great to put faces to names. Quick apology though. I know a few of you were sat in the waiting room and I didn't see you so you didn't get let in. That's on me I'm sorry. It's the first one so there's always a teething issue or two. I'll keep a much closer eye on it next time so nobody gets left outside. If you missed out because of that drop me a message or comment below with what you wanted to ask and I'll make sure it gets answered or I’ll arrange a zoom with you. More sessions coming soon. Let's keep building 💪
1 like • 6h
Hopefully see you on the next one 👍🏻
1 like • 5h
@Liam Stone I’ll put this one in my diary so I don’t miss it once you have a date
Valuation for bridging
When you get a valuation for a bridging loan do you always make sure you’re there in person?
1 like • 6h
@Liam Stone yeah good. He valued it at pretty much spot on what I had allowed for in my figures but the structural problem might kill it. Also they valued it at what I’m buying it for not what it’s up for sale for which will mean they will lend less
0 likes • 5h
@Liam Stone yes they knew. Don’t know if that then affects what they value it at, the lender we had lined up was originally lending off the sale price, well that was what I was told
Live Call tonight at 6pm – bring your questions
Quick reminder that our first Full Circle Live Call is tonight, Tuesday 17 November at 6pm on Zoom We'll talk about the market and my outlook and finish with an open Q&A.
1 like • 6h
Gutted I missed it. Hopefully catch the next one
Structural report
Evening all, I had a valuation done last week on a 200-year-old cottage I’m buying. I knew it had some single-skin walls and had allowed for upgrading them, but I couldn’t see any signs of structural damage when I viewed it, so my offer didn’t factor in any structural repairs. The valuer has flagged potential structural issues with the rear extension and recommended getting a structural engineer’s report. They’ve suggested that, worst case, the extension could need rebuilding at a cost of around £70k. I did tell the sellers I wouldn’t come back with a lower offer at this stage, provided nothing came up that I hadn’t already been told about. The single-skin walls were discussed, but no structural concerns were mentioned. Hopefully the valuer is just being cautious. My instinct is to speak to the agent first and see if the sellers are open to moving on price before I spend more money on a structural engineer. Has anyone been through something similar? Did you speak to the agent about price first or get the structural report before trying to renegotiate?
1
0
What would you do? A hypothetical to think through
You've viewed a terraced house that looks good on paper the numbers work if the refurb comes in where you expect on the second viewing you notice a damp patch in the back bedroom that you missed the first time the agent says there's another viewing booked for tomorrow. There's no single right answer and that's the point I'm more interested in how you'd think it through than what you'd decide. Some things to consider · What would you want to know before making any offer? · Who would you ask and what would you ask them? · Would the other viewing change how you approach it? Should it? What's the first thing you'd do next and why?
0 likes • 4d
I would try & work out my numbers on worse case scenario regarding the damp. Take plenty of photos/videos & speak to a surveyor to get their opinion. Could be something simple like a leaking gutter.
1-10 of 20
Andrew Little
3
33 points to level up
@andrew-little-2274
I’m Andy, construction business owner. 5am starts, discipline over motivation. Showing up daily, pushing limits, no excuses 💪🏻

Active 5h ago
Joined Oct 14, 2026
Powered by